The engineering studies will be critical in determining the ultimate cost and timeline for fully repairing the culvert and restoring structural integrity to the affected buildings on Elm Street.
The Tyler City Council has approved $290,000 in design and engineering services to address a critical infrastructure failure that threatens downtown buildings and safety.
The City of Tyler will be addressing structural stormwater damage to a building and underground drainage pipe in the downtown Elm Street area through hiring specialized engineering firms, approved an ...
After significant damage was discovered in a drainage culvert on East Elm Street, Tyler’s city council approved two essential contracts on Wednesday aimed at assessing and ...